New Projects
Polk County
Jones Edmunds was selected by the Polk County Board of County Commissioners for their North Central Landfill Class I Phase III Gas Collection and Control System Operation, Maintenance, Repair, and Management Services contract. Ultimately, our Winter Haven office in Polk County made the difference in securing this win. “The investment that we made in the Polk County office won us at least $1,000,000 of work over the next 5 years,” said Dennis Davis, Senior Department Manager. Thanks to the dedication and resolve of our staff to market existing and potential clients, we have had two big wins over the past 2 weeks – this project and the Winter Haven Wastewater Treatment Plant No. 3 Reclaimed Water Pumping Station and Pipeline. Congratulations to everyone involved in these pursuits.
Published: May 2012
Florida Governmental Utility Authority
Jones Edmunds was selected for the Florida Governmental Utility Authority’s (FGUA) Water and Wastewater Professional Engineering Services contract. The FGUA was formed in 1999 through an interlocal agreement between four Counties and now includes Lee, Polk, Citrus, Pasco, Hendry, and DeSoto Counties. The FGUA uses resource sharing to provide essential water and sewer utility services—with efficiency and local management in mind—to approximately 90,000 Floridians daily. This is a new client for Jones Edmunds, and the contract will be the first of many with the FGUA. Great job, team. Published: May 2012
City of Winter Haven
Jones Edmunds was recently selected for the City of Winter Haven’s Wastewater Treatment Plant No. 3 (WWTP 3) Reclaimed Water Pumping Station and Pipeline project. This is our first contract with the City, and it will help build the foundation for a long-term, successful relationship. Jones Edmunds will complete the project in three phases, providing preliminary engineering design of the pump station and piping with the route selection of piping, final design and permitting of pump station and piping, and engineering services during construction. “This win comes after our third short list presentation to the City over the last year. It has truly been a team effort to get us to this point. Thanks to everyone involved for all your hard work,” said Jim Tully, Project Scientist in Winter Haven.
Published: April 2012
Marion County
Jones Edmunds was recently one of the top two firms selected by Marion County for their Elements of Watershed Management Program. The WMP includes five major elements: Digital Topographic Information, Watershed Evaluation, Watershed Management Plan, Implementation of Best Management Practices, and Maintenance of Watershed Parameters and Models. We have been working with Marion County since 1984 and look forward to this opportunity to continue working with them. Great work, team!
Published: February 2012
Pinellas County
Jones Edmunds was recently selected by Pinellas County for its Construction Engineering & Inspection Consultant Services Contract to assist the Department of Environment and Infrastructure with implementing the County’s Capital Improvement Plan. JEAces, a subsidiary of Jones Edmunds, was also selected as a sub to Jones Edmunds, URS Construction Services, Inc, and HDR Construction Control Corp. Tasks under this 3-year contract may include program management, quality assurance/quality control, construction project administration, construction inspection, engineering support services, contracts and bidding, surveying services, and geotechnical services. Congratulations to all those involved in this effort.
Published: February 2012
Braden River Utilities
 Jones Edmunds was recently selected by Braden River Utilities for its Reclaimed Water Interconnect project with the City of Bradenton. The objective of this project is to maximize the use of reclaimed water to meet the community’s irrigation demands and to reduce reliance on traditional irrigation sources. Pending approval by SWFWMD, professional services will include survey, data collection, project management, engineering analyses, construction plans preparation, permit application preparation and processing, project specifications and bid documents preparation, construction estimates preparation, and construction administration. Congratulations, team!
Published: January 2012
Jones Edmunds was selected for the City of Tavares’ Comprehensive Project Management and Engineering Design for Improvements to the City of Tavares Wastewater Systems in the Lake Francis Subdivision and Other City Wastewater Improvements project. Services under this contract will include:
· Design and engineering of projects including bid document preparation, construction management, and resident inspection service on City projects.
· All aspects of grant application work including procurement, management, reimbursement processing, and close-out.
· Financial planning and consultation in conjunction with City financial advisors.
Jones Edmunds has been working with the City for 5 years and looks forward to continuing our relationship for years to come.
Published: January 2012
Marion County
 Jones Edmunds was recently selected by Marion County for their Engineering Consultants for Utilities contract. The County selected six firms and Jones Edmunds ranked second. This 5-year contract includes projects in water and wastewater permitting, design and construction; consumptive use permits and renewals; collection and distribution design, construction and upgrades; master plan updates, construction management and inspection; and effluent reuse program. Thank you to all those involved in this effort.
Published: January 2012
City of Tallahassee
Jones Edmunds was chosen as one of the consultants for the City of Tallahassee’s stormwater management services contract. The contract, which includes stormwater capital improvement projects, National Pollutant Discharge Elimination System assistance/compliance services, water quality services, Federal Emergency Management Agency assistance, drainage studies and reports, land acquisitions assistance, construction engineering and inspection, and supplemental services, will have an initial term of 3 years with two 1-year extension options. This is a new client for Jones Edmunds and is an excellent opportunity to expand our professional network and build stronger relationships in the area.
Published: December 2011
City of Lake City
Jones Edmunds was recently selected for a 3-year continuing civil/environmental consulting services contract for the City of Lake City, with a 2-year extension option. The contract will include water, wastewater, stormwater, natural gas, street, and sidewalk projects. Published: November 2011
City of Oldsmar
Jones Edmunds was reselected for the City of Oldsmar’s General Engineering Services for Water and Water Reclamation Operations Contract. Under this contract, we will be working on utilities including their existing water reclamation facility, new reverse osmosis water treatment plant, and related deep well for reverse osmosis concentrate disposal as well as providing ASR services. Oldsmar has been a client since 2001, and we look forward to continue working with the City over the next 3 years to achieve long-term goals and regulatory compliance. Published: September 2011
Siemens and City of Clearwater
Jones Edmunds will provide engineering services for the design and construction of various projects under a Siemens Performance Contract with City of Clearwater. As an Energy Services Company, Siemens develops, installs, and arranges financing for projects designed to improve the energy efficiency and maintenance costs for facilities and guarantees the annual savings. We teamed with Siemens to perform energy audits on the City’s three waste reclamation facilities, and the final energy audit accepted by the City identified over $10,000,000 of capital improvement projects. This new contract will implement these recommended projects, including developing alternative energy by producing electricity from cogenerating biogas. The project financing is paid for based on the annual energy and operational savings realized by the City.
Published: August 2011
|