Featured Projects

FDEP Sebastian Inlet State Park New Concession Building

Jones Edmunds designed, obtained permitting, and provided construction services ...

FDEP Sebastian Inlet State Park New Concession Building

Jones Edmunds designed, obtained permitting, and provided construction services to the Florida Department of Environmental Protection (FDEP) for a new 5,000-SF two-story concession and gift shop building at the Sebastian Inlet State Park. The design included civil, environmental, mechanical, electrical, and structural elements, as well as coordinating on the architectural components of the project. This project also involved demolishing the existing 1,600-SF concession building and associated deck areas. The new structure includes a food concession area to accommodate approximately 50 people, as well as a gift shop, a rental space for special events, and a covered open-air deck. The facility provides boardwalk and deck areas with views overlooking Sebastian Inlet and the Atlantic Ocean. Special design considerations included permitting seaward of the Coastal Construction Control Line and lighting that minimizes the effect on sea turtle habitat.

Space Florida Exploration Park Wetlands Mitigation

This commercial aerospace project involved an extremely aggressive design build ...

Space Florida Exploration Park Wetlands Mitigation

This commercial aerospace project involved an extremely aggressive design build approach with very short timelines for planning, permitting, design, and construction. The project required close coordination with state and federal regulatory agencies to complete their permitting process including development of acceptable mitigation plans within a 4-month time frame. This project entails designing and permitting a wetland mitigation plan with St. Johns River Water Management District and United States Army Corps of Engineers to mitigate for wetland impacts due to launch facility construction.

NASA Siting Study for Central Campus Complex

Jones Edmunds provided master planning services for a Siting Study for a propose...

NASA Siting Study for Central Campus Complex

Jones Edmunds provided master planning services for a Siting Study for a proposed Central Campus Complex at Kennedy Space Center. The Central Campus Complex Study evaluated consolidating nine facilities in the KSC Industrial Area (totaling 675,000 SF) into new buildings to be constructed on the existing Headquarters site. The Study evaluated multiple construction and demolition phasing options.

NASA Schwartz Road Landfill Closure

Jones Edmunds prepared construction drawings, specifications, and engineering re...

NASA Schwartz Road Landfill Closure

Jones Edmunds prepared construction drawings, specifications, and engineering reports necessary to close the 64-acre Schwartz Road Landfill. This landfill had operated since the late 1960s and received a combination of demolition debris and municipal solid waste from activities at Kennedy Space Center.

NASA Launch Complex 39B Structure Demolition

Jones Edmunds provided engineering study, design, and construction-phase service...

NASA Launch Complex 39B Structure Demolition

Jones Edmunds provided engineering study, design, and construction-phase services for the demolition of the Rotating Service Structure and the Fixed Service Structure at Launch Complex Pad 39B, which included extensive preparation to disconnect multiple systems. The facility was demolished to prepare the launch pad to be converted from the Shuttle Launch Program to the NASA Constellation and other future programs.

Citrus County Title V Compliance, GHG Verification, and GCCS Maintenance & Reporting

Jones Edmunds provided engineering services to the Citrus County Central Landfil...

Citrus County Title V Compliance, GHG Verification, and GCCS Maintenance & Reporting

Jones Edmunds provided engineering services to the Citrus County Central Landfill to meet the landfill gas (LFG) monitoring and reporting requirements of the Solid Waste and Title V Operations Permit for Reporting Year 2017 (January 1 through December 31, 2017). The landfill operates under Florida Department of Environmental Protection (FDEP) permits: a Title V Operations Permit and a Solid Waste Operations Permit. The worked completed included:
  • LFG Wellfield Balancing and Maintenance –Field work performed by our subcontract firm Sullivan Environmental and reporting performed by Jones Edmunds.
  • Title V Compliance – Jones Edmunds performed all record-keeping and reporting to FED.
  • Greenhouse Gas Reporting – Jones Edmunds performed all record-keeping and reporting to EPA.
  • Greenhouse Gas Verification – Jones Edmunds performed all record-keeping, calculations, and reporting to Ruby Canyon and EPA.

Environmental

Jones Edmunds offers environmental services to support our clients regulatory or investigative needs. Projects across many technical arenas are regulated by FDEP permits or other requirements that involve environmental support to ensure compliance. We offer a wide range of services to help keep our clients in regulatory compliance, safeguard the well-being of our communities, and protect the environment. We offer:

  • Surface Water, Groundwater, and Gas Monitoring, Data Management & Reporting
  • Heavy Metals, PCB, and Asbestos Sampling & Reporting
  • Contamination Assessment and Remediation
  • Environmental Assessments
  • Environmental Impact Studies
Jones Edmunds Logo
Skip to content