Jones Edmunds provided preliminary design, field data collection, final design, permitting, bidding, and construction administration services for the design of large-diameter wastewater transmission force mains and improvements to two lift stations serving the east side of the City of Bradenton and their associated force mains and gravity interceptors. These improvements were intended to replace aging facilities, provide flow relief to existing facilities, and provide increased wastewater transmission for the east side of the City. These improvements also included design and construction of expansions to two main lift stations in the system. Jones Edmunds coordinated the extensive permitting efforts required for the project that included: